Back to the backflow review queue

Backflow assembly test: 8406 Stone Gate Ln

Approved

Filed Oct 23, 2025 by Morgan Marsh, Summit Plumbing & Backflow. Read in from a paper form and confirmed by staff.

Report

Date of service
Oct 23, 2025
Assembly type
PVB
Serial number
B807269
Size
3/4
Test gauge serial
G-2828
Gauge calibration date
Apr 17, 2025
Check valve 1
5.9 psid
Check valve 1 closed tight
Yes
Check valve 2
2.2 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Morgan Marsh, current on the service date
  • All required fields present
  • Address matches parcel 073-41-01188
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.

Property

8406 Stone Gate Ln
Owner: Emerson Okafor
Parcel 073-41-01188