Back to the backflow review queue
Backflow assembly test: 4668 Ridgeview Ln
ApprovedFiled Dec 6, 2024 by Logan Benton, Patriot Plumbing & Backflow. Filed from a phone.
Report
- Date of service
- Dec 6, 2024
- Assembly type
- DC
- Serial number
- A232848
- Size
- 1
- Test gauge serial
- G-1203
- Gauge calibration date
- Sep 9, 2023
- Check valve 1
- 8.7 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 1 psid
- Result
- Repaired and passed
- Repairs made
- Replaced check valve 1 rubber
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Logan Benton, current on the service date
- All required fields present
- Address matches parcel 013-80-01076
- Test gauge calibration is more than a year old.
- Result: passing. Next due date resets when approved.
Decision
Approved by J. Staff. The property's next due date is set and the owner gets a receipt.
Property
4668 Ridgeview Ln
Owner: Avery Ramirez
Parcel 013-80-01076