Back to the backflow review queue

Backflow assembly test: 5598 Orchard Way

Approved

Filed Jun 29, 2025 by Morgan Stroud, Patriot Plumbing & Backflow. Filed from a phone.

Report

Date of service
Jun 29, 2025
Assembly type
RP
Serial number
K334286
Size
3/4
Test gauge serial
G-8926
Gauge calibration date
May 7, 2025
Check valve 1
8.1 psid
Check valve 1 closed tight
Yes
Check valve 2
3.5 psid
Relief valve opened at
4.2 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Morgan Stroud, current on the service date
  • All required fields present
  • Address matches parcel 021-99-01168
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.

Property

5598 Orchard Way
Owner: Emerson Brandt
Parcel 021-99-01168