Back to the backflow review queue

Backflow assembly test: 1729 Cedar Hollow Trl

Approved

Filed Aug 21, 2026 by Morgan Stroud, Patriot Plumbing & Backflow. Read in from a paper form and confirmed by staff.

Report

Date of service
Aug 21, 2026
Assembly type
PVB
Serial number
W281754
Size
3/4
Test gauge serial
G-8004
Gauge calibration date
May 8, 2025
Check valve 1
0 psid
Check valve 1 closed tight
No
Check valve 2
3.6 psid
Result
Fail
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Morgan Stroud, current on the service date
  • All required fields present
  • Address matches parcel 021-49-01039
  • Test gauge calibration is more than a year old.
  • Result: needs follow-up. The property stays on the overdue list until a passing report arrives.

Decision

Approved by J. Staff. The property's next due date is set and the owner gets a receipt.

Property

1729 Cedar Hollow Trl
Owner: Sam Vance
Parcel 021-49-01039