Back to the backflow review queue

Backflow assembly test: 9550 Quarry Ct

Approved

Filed Jun 29, 2024 by Cameron Danner, Northstar Plumbing & Backflow. Filed from a phone.

Report

Date of service
Jun 29, 2024
Assembly type
PVB
Serial number
B455586
Size
1
Test gauge serial
G-3069
Gauge calibration date
May 19, 2024
Check valve 1
6.8 psid
Check valve 1 closed tight
Yes
Check valve 2
3.6 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Cameron Danner, current on the service date
  • All required fields present
  • Address matches parcel 025-36-01007
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by J. Staff. The property's next due date is set and the owner gets a receipt.

Property

9550 Quarry Ct
Owner: Sam Hollins
Parcel 025-36-01007