Back to the backflow review queue

Backflow assembly test: 8076 Stone Gate Trl

Approved

Filed Jan 6, 2026 by Sam Fairley, Northstar Plumbing & Backflow. Read in from a paper form and confirmed by staff.

Report

Date of service
Jan 6, 2026
Assembly type
PVB
Serial number
K995017
Size
3/4
Test gauge serial
G-9280
Gauge calibration date
Sep 24, 2024
Check valve 1
6.5 psid
Check valve 1 closed tight
Yes
Check valve 2
1.9 psid
Result
Repaired and passed
Repairs made
Replaced check valve 1 rubber
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Sam Fairley, current on the service date
  • All required fields present
  • Address matches parcel 007-90-01269
  • Test gauge calibration is more than a year old.
  • Result: passing. Next due date resets when approved.

Decision

Approved by J. Staff. The property's next due date is set and the owner gets a receipt.

Property

8076 Stone Gate Trl
Owner: Emerson Hollins
Parcel 007-90-01269