Back to the backflow review queue

Backflow assembly test: Corner Elementary School

Approved

Filed Jan 21, 2025 by Drew Vance, Clearwater Plumbing & Backflow. Filed from a phone.

Report

Date of service
Jan 21, 2025
Assembly type
RP
Serial number
B691961
Size
1 1/2
Test gauge serial
G-5029
Gauge calibration date
Dec 9, 2024
Check valve 1
4.2 psid
Check valve 1 closed tight
Yes
Check valve 2
2.1 psid
Relief valve opened at
2.5 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Drew Vance, current on the service date
  • All required fields present
  • Address matches parcel 045-24-01164
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.

Property

6175 Hickory Rd
Owner: Fairley Holdings LLC
Parcel 045-24-01164