Back to the backflow review queue
Backflow assembly test: Corner Elementary School
ApprovedFiled Jan 21, 2025 by Drew Vance, Clearwater Plumbing & Backflow. Filed from a phone.
Report
- Date of service
- Jan 21, 2025
- Assembly type
- RP
- Serial number
- B691961
- Size
- 1 1/2
- Test gauge serial
- G-5029
- Gauge calibration date
- Dec 9, 2024
- Check valve 1
- 4.2 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 2.1 psid
- Relief valve opened at
- 2.5 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Drew Vance, current on the service date
- All required fields present
- Address matches parcel 045-24-01164
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.
Property
6175 Hickory Rd
Owner: Fairley Holdings LLC
Parcel 045-24-01164