Back to the backflow review queue

Backflow assembly test: 6513 Cedar Hollow Trl

Approved

Filed Nov 7, 2025 by Cameron Whitcomb, Patriot Plumbing & Backflow. Filed from a phone.

Report

Date of service
Nov 7, 2025
Assembly type
DC
Serial number
B170036
Size
1
Test gauge serial
G-4578
Gauge calibration date
Jan 13, 2025
Check valve 1
5.9 psid
Check valve 1 closed tight
Yes
Check valve 2
3.8 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Cameron Whitcomb, current on the service date
  • All required fields present
  • Address matches parcel 045-60-01165
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.

Property

6513 Cedar Hollow Trl
Owner: Logan Ramirez
Parcel 045-60-01165