Back to the backflow review queue

Backflow assembly test: 9498 Cedar Hollow Way

Approved

Filed Feb 24, 2025 by Cameron Whitcomb, Patriot Plumbing & Backflow. Filed from a phone.

Report

Date of service
Feb 24, 2025
Assembly type
DC
Serial number
B563978
Size
1
Test gauge serial
G-8788
Gauge calibration date
Jul 5, 2024
Check valve 1
5.6 psid
Check valve 1 closed tight
Yes
Check valve 2
2.1 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Cameron Whitcomb, current on the service date
  • All required fields present
  • Address matches parcel 045-53-01138
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.

Property

9498 Cedar Hollow Way
Owner: Shawn Kessler
Parcel 045-53-01138