Back to the backflow review queue

Backflow assembly test: 217 Pine Knoll Way

Approved

Filed Jun 7, 2024 by Drew Vance, Clearwater Plumbing & Backflow. Filed from a phone.

Report

Date of service
Jun 7, 2024
Assembly type
DC
Serial number
K402878
Size
1
Test gauge serial
G-9647
Gauge calibration date
Dec 5, 2023
Check valve 1
3.3 psid
Check valve 1 closed tight
Yes
Check valve 2
1.9 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Drew Vance, current on the service date
  • All required fields present
  • Address matches parcel 045-56-01215
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.

Property

217 Pine Knoll Way
Owner: Hayden Marsh
Parcel 045-56-01215