Back to the backflow review queue

Backflow assembly test: Maple Leaf Medical Offices

Approved

Filed Mar 27, 2025 by Parker Ashby, Northstar Plumbing & Backflow. Read in from a paper form and confirmed by staff.

Report

Date of service
Mar 27, 2025
Assembly type
RP
Serial number
K505598
Size
2
Test gauge serial
G-7474
Gauge calibration date
Dec 6, 2024
Check valve 1
7.8 psid
Check valve 1 closed tight
Yes
Check valve 2
2.2 psid
Relief valve opened at
2.6 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Parker Ashby, current on the service date
  • All required fields present
  • Address matches parcel 131-43-01061
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.

Property

3846 Quarry Dr
Owner: Danner Holdings LLC
Parcel 131-43-01061