Back to the backflow review queue

Backflow assembly test: Blue Heron Animal Hospital

Approved

Filed Jul 1, 2023 by Parker Ashby, Northstar Plumbing & Backflow. Filed from a phone.

Report

Date of service
Jul 1, 2023
Assembly type
RP
Serial number
B715997
Size
4
Test gauge serial
G-7542
Gauge calibration date
Apr 5, 2023
Check valve 1
5.8 psid
Check valve 1 closed tight
Yes
Check valve 2
2.3 psid
Relief valve opened at
2.9 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Parker Ashby, current on the service date
  • All required fields present
  • Address matches parcel 131-69-01172
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.

Property

6527 Orchard Dr
Owner: Danner Holdings LLC
Parcel 131-69-01172