Back to the backflow review queue

Backflow assembly test: 4853 Cedar Hollow Way

Approved

Filed May 28, 2026 by Parker Kessler, Keystone Backflow Testing. Filed from a phone.

Report

Date of service
May 28, 2026
Assembly type
DC
Serial number
Z986783
Size
3/4
Test gauge serial
G-7703
Gauge calibration date
Feb 13, 2026
Check valve 1
5.7 psid
Check valve 1 closed tight
Yes
Check valve 2
2.1 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Parker Kessler, current on the service date
  • All required fields present
  • Address matches parcel 001-35-01208
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.

Property

4853 Cedar Hollow Way
Owner: Jordan Nguyen
Parcel 001-35-01208