Back to the backflow review queue

Backflow assembly test: 1203 Mill Creek Rd

Approved

Filed Oct 2, 2023 by Rowan Okafor, Ridge Backflow Testing. Filed from a phone.

Report

Date of service
Oct 2, 2023
Assembly type
RP
Serial number
W723149
Size
3/4
Test gauge serial
G-3166
Gauge calibration date
Nov 20, 2022
Check valve 1
0 psid
Check valve 1 closed tight
No
Check valve 2
3.3 psid
Relief valve opened at
2.9 psid
Result
Fail
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Rowan Okafor, current on the service date
  • All required fields present
  • Address matches parcel 001-46-01355
  • Readings in range, no flags
  • Result: needs follow-up. The property stays on the overdue list until a passing report arrives.

Decision

Approved by J. Staff. The property's next due date is set and the owner gets a receipt.

Property

1203 Mill Creek Rd
Owner: Reese Stroud
Parcel 001-46-01355