Back to the backflow review queue
Backflow assembly test: 205 Laurel Ct
ApprovedFiled Nov 30, 2023 by Quinn Nguyen, Keystone Backflow Testing. Filed from a phone.
Report
- Date of service
- Nov 30, 2023
- Assembly type
- RP
- Serial number
- B731661
- Size
- 3/4
- Test gauge serial
- G-2900
- Gauge calibration date
- Sep 6, 2023
- Check valve 1
- 7.6 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 2.7 psid
- Relief valve opened at
- 2.9 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Quinn Nguyen, current on the service date
- All required fields present
- Address matches parcel 001-69-01170
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.
Property
205 Laurel Ct
Owner: Hayden Calloway
Parcel 001-69-01170