Back to the stormwater review queue

Stormwater facility inspection: Blue Heron Taqueria

Approved

Filed Mar 27, 2024 by Blake Lindqvist, Evergreen Engineering. Filed from a phone.

Report

Date of service
Mar 27, 2024
Facility type
Bioretention
Sediment accumulation
17 % of capacity
Inlet and outlet clear
Yes
Erosion or embankment damage
No
Vegetation maintained
Yes
Functioning as designed
Yes
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Blake Lindqvist, current on the service date
  • All required fields present
  • Address matches parcel 001-85-01060
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.

Property

2313 Pine Knoll Ln
Owner: Ellery Holdings LLC
Parcel 001-85-01060