Back to the septic review queue

Septic maintenance (pump-out): 2013 Stone Gate Way

Approved

Filed Aug 26, 2023 by Hayden Kessler, Summit Wastewater. Filed from a phone.

Report

Date of service
Aug 26, 2023
Tank size
1000 gal
Compartments
2
Parts this system has
Septic tank, Distribution box, Drainfield or mound
Gallons pumped
887 gal
Sludge depth
32 in
Scum depth
4 in
Baffles in good condition
No
Effluent filter
Cleaned
Lids and risers secure
No
Distribution box level, clear and undamaged
Yes
Drainfield or mound: no surfacing, soggy ground or odor
Yes
Disposal site
County treatment plant
Repair needed
Yes
Repair needed: describe
Cracked lid
Photos
None
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Hayden Kessler, current on the service date
  • All required fields present
  • Address matches parcel 001-29-01349
  • Sludge is over a third of a typical tank depth; check for system failure.
  • Baffles reported damaged; county may require repair.
  • Unsecured lids are a safety hazard.
  • No photos attached.
  • Result: needs follow-up. The property stays on the overdue list until a passing report arrives.

Decision

Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.

Property

2013 Stone Gate Way
Owner: Alex Wexler
Parcel 001-29-01349