Back to the stormwater review queue
Stormwater facility inspection: Station Diner
ApprovedFiled Nov 3, 2025 by Jordan Fairley, Lakeside Engineering. Filed from a phone.
Report
- Date of service
- Nov 3, 2025
- Facility type
- Bioretention
- Sediment accumulation
- 19 % of capacity
- Inlet and outlet clear
- Yes
- Erosion or embankment damage
- No
- Vegetation maintained
- Yes
- Functioning as designed
- Yes
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Jordan Fairley, current on the service date
- All required fields present
- Address matches parcel 001-82-01288
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.
Property
9217 Cedar Hollow Way
Owner: Marsh Holdings LLC
Parcel 001-82-01288