Back to the stormwater review queue

Stormwater facility inspection: Station Diner

Sent back

Filed Nov 24, 2026 by Drew Fairley, Lakeside Engineering. Read in from a paper form and confirmed by staff.

Report

Date of service
Nov 24, 2026
Facility type
Bioretention
Sediment accumulation
33 % of capacity
Inlet and outlet clear
Yes
Erosion or embankment damage
No
Vegetation maintained
Yes
Functioning as designed
Yes
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Drew Fairley, current on the service date
  • All required fields present
  • Address matches parcel 001-82-01288
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Sent back Please attach photos of the inlet and outlet.

Property

9217 Cedar Hollow Way
Owner: Marsh Holdings LLC
Parcel 001-82-01288