Back to the septic review queue

Septic maintenance (pump-out): 2631 Quarry Ln

Approved

Filed Aug 21, 2021 by Jamie Ellery, Summit Wastewater. Filed from a phone.

Report

Date of service
Aug 21, 2021
Tank size
1250 gal
Compartments
2
Parts this system has
Septic tank, Pump tank and effluent pump, High-water alarm, Drainfield or mound
Gallons pumped
1240 gal
Sludge depth
18 in
Scum depth
2 in
Baffles in good condition
Yes
Effluent filter
Cleaned
Lids and risers secure
Yes
Pump runs and the floats turn it on and off
Yes
Alarm tested and working
Yes
Drainfield or mound: no surfacing, soggy ground or odor
Yes
Disposal site
Regional wastewater plant
Repair needed
No
Photos
None
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Jamie Ellery, current on the service date
  • All required fields present
  • Address matches parcel 007-18-01240
  • No photos attached.
  • Result: passing. Next due date resets when approved.

Decision

Approved by J. Staff. The property's next due date is set and the owner gets a receipt.

Property

2631 Quarry Ln
Owner: Jordan Lindqvist
Parcel 007-18-01240