Back to the backflow review queue

Backflow assembly test: Blue Heron Bakery

Filed Nov 29, 2026 by Parker Ashby, Northstar Backflow Testing. Read in from a paper form and confirmed by staff.

Report

Date of service
Nov 29, 2026
Assembly type
RP
Serial number
K550275
Size
2
Test gauge serial
G-4496
Gauge calibration date
Apr 6, 2026
Check valve 1
5.7 psid
Check valve 1 closed tight
Yes
Check valve 2
4 psid
Relief valve opened at
3 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Parker Ashby, current on the service date
  • All required fields present
  • Address matches parcel 013-45-01080
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Property

5838 Turkey Hill Trl
Owner: Ramirez Holdings LLC
Parcel 013-45-01080