Back to the backflow review queue

Backflow assembly test: Two Rivers Market

Approved

Filed Jul 29, 2024 by Jamie Whitcomb, Northstar Backflow Testing. Filed from a phone.

Report

Date of service
Jul 29, 2024
Assembly type
RP
Serial number
W508526
Size
2
Test gauge serial
G-6762
Gauge calibration date
Apr 20, 2023
Check valve 1
7 psid
Check valve 1 closed tight
Yes
Check valve 2
1.8 psid
Relief valve opened at
1.4 psid
Result
Repaired and passed
Repairs made
Replaced check valve 1 rubber
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Jamie Whitcomb, current on the service date
  • All required fields present
  • Address matches parcel 013-15-01102
  • RP relief valve must open at 2.0 psid or more.
  • Test gauge calibration is more than a year old.
  • Result: passing. Next due date resets when approved.

Decision

Approved by J. Staff. The property's next due date is set and the owner gets a receipt.

Property

7767 Spring Branch Rd
Owner: Calloway Holdings LLC
Parcel 013-15-01102