Back to the backflow review queue
Backflow assembly test: Maple Leaf Taqueria
ApprovedFiled Oct 19, 2026 by Avery Ashby, Summit Backflow Testing. Filed from a phone.
Report
- Date of service
- Oct 19, 2026
- Assembly type
- RP
- Serial number
- B896044
- Size
- 1 1/2
- Test gauge serial
- G-6112
- Gauge calibration date
- Jul 7, 2026
- Check valve 1
- 4.9 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 3.7 psid
- Relief valve opened at
- 4 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Avery Ashby, current on the service date
- All required fields present
- Address matches parcel 017-27-01287
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.
Property
1040 Stone Gate Trl
Owner: Stroud Holdings LLC
Parcel 017-27-01287