Back to the backflow review queue

Backflow assembly test: 3907 Turkey Hill Dr

Approved

Filed Apr 13, 2026 by Logan Fairley, Valley Plumbing & Backflow. Filed from a phone.

Report

Date of service
Apr 13, 2026
Assembly type
PVB
Serial number
A585942
Size
1
Test gauge serial
G-8868
Gauge calibration date
Aug 6, 2025
Check valve 1
0.8 psid
Check valve 1 closed tight
No
Check valve 2
3.3 psid
Result
Fail
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Logan Fairley, current on the service date
  • All required fields present
  • Address matches parcel 017-81-01010
  • Readings in range, no flags
  • Result: needs follow-up. The property stays on the overdue list until a passing report arrives.

Decision

Approved by J. Staff. The property's next due date is set and the owner gets a receipt.

Property

3907 Turkey Hill Dr
Owner: Jordan Hollins
Parcel 017-81-01010