Back to the septic review queue

Septic maintenance (pump-out): 7623 Pine Knoll Rd

Approved

Filed Sep 28, 2026 by Jamie Fairley, Summit Wastewater. Filed from a phone.

Report

Date of service
Sep 28, 2026
Tank size
1000 gal
Compartments
2
Parts this system has
Septic tank, Pump tank and effluent pump, High-water alarm, Drainfield or mound
Gallons pumped
1049 gal
Sludge depth
17 in
Scum depth
5 in
Baffles in good condition
Yes
Effluent filter
Cleaned
Lids and risers secure
Yes
Pump runs and the floats turn it on and off
Yes
Alarm tested and working
Yes
Drainfield or mound: no surfacing, soggy ground or odor
Yes
Disposal site
Regional wastewater plant
Repair needed
No
Photos
2 attached
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Jamie Fairley, current on the service date
  • All required fields present
  • Address matches parcel 017-46-01250
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.

Property

7623 Pine Knoll Rd
Owner: Riley Hollins
Parcel 017-46-01250