Back to the backflow review queue
Backflow assembly test: 2525 Old Church Dr
ApprovedFiled Apr 30, 2025 by Avery Vance, Ridge Backflow Testing. Read in from a paper form and confirmed by staff.
Report
- Date of service
- Apr 30, 2025
- Assembly type
- DC
- Serial number
- B614500
- Size
- 3/4
- Test gauge serial
- G-4516
- Gauge calibration date
- Oct 24, 2024
- Check valve 1
- 8 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 2.8 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Avery Vance, current on the service date
- All required fields present
- Address matches parcel 025-50-01184
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.
Property
2525 Old Church Dr
Owner: Hayden Ellery
Parcel 025-50-01184