Back to the septic review queue

Septic maintenance (pump-out): 156 Hickory Way

Approved

Filed May 23, 2023 by Cameron Marsh, Summit Wastewater. Filed from a phone.

Report

Date of service
May 23, 2023
Tank size
1000 gal
Compartments
2
Parts this system has
Septic tank, Drainfield or mound
Gallons pumped
1001 gal
Sludge depth
10 in
Scum depth
4 in
Baffles in good condition
Yes
Effluent filter
Cleaned
Lids and risers secure
Yes
Drainfield or mound: no surfacing, soggy ground or odor
Yes
Disposal site
Regional wastewater plant
Repair needed
No
Photos
2 attached
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Cameron Marsh, current on the service date
  • All required fields present
  • Address matches parcel 037-56-01015
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.

Property

156 Hickory Way
Owner: Riley Kessler
Parcel 037-56-01015