Back to the septic review queue

Septic maintenance (pump-out): 9231 Ridgeview Rd

Approved

Filed Dec 8, 2023 by Jamie Harlow, Summit Wastewater. Read in from a paper form and confirmed by staff.

Report

Date of service
Dec 8, 2023
Tank size
1000 gal
Compartments
1
Parts this system has
Septic tank, Distribution box, Drainfield or mound
Gallons pumped
882 gal
Sludge depth
25 in
Scum depth
3 in
Baffles in good condition
Yes
Effluent filter
Cleaned
Lids and risers secure
No
Distribution box level, clear and undamaged
No
Drainfield or mound: no surfacing, soggy ground or odor
Yes
Disposal site
Permitted land-application site
Repair needed
No
Photos
2 attached
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Jamie Harlow, current on the service date
  • All required fields present
  • Address matches parcel 037-94-01269
  • Sludge is over a third of a typical tank depth; check for system failure.
  • Unsecured lids are a safety hazard.
  • Distribution box reported uneven, blocked or damaged.
  • Result: passing. Next due date resets when approved.

Decision

Approved by J. Staff. The property's next due date is set and the owner gets a receipt.

Property

9231 Ridgeview Rd
Owner: Sam Nguyen
Parcel 037-94-01269