Back to the septic review queue

Septic maintenance (pump-out): 4747 Meadow Lark Dr

Approved

Filed Mar 6, 2022 by Cameron Marsh, Summit Wastewater. Filed from a phone.

Report

Date of service
Mar 6, 2022
Tank size
1000 gal
Compartments
2
Parts this system has
Septic tank, Drainfield or mound
Gallons pumped
933 gal
Sludge depth
31 in
Scum depth
2 in
Baffles in good condition
Yes
Effluent filter
Replaced
Lids and risers secure
Yes
Drainfield or mound: no surfacing, soggy ground or odor
Yes
Disposal site
Regional wastewater plant
Repair needed
Yes
Repair needed: describe
Outlet baffle missing
Photos
None
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Cameron Marsh, current on the service date
  • All required fields present
  • Address matches parcel 037-78-01348
  • Sludge is over a third of a typical tank depth; check for system failure.
  • No photos attached.
  • Result: needs follow-up. The property stays on the overdue list until a passing report arrives.

Decision

Approved by J. Staff. The property's next due date is set and the owner gets a receipt.

Property

4747 Meadow Lark Dr
Owner: Parker Nguyen
Parcel 037-78-01348