Back to the septic review queue
Septic maintenance (pump-out): 1854 Quarry Ct
ApprovedFiled Feb 20, 2023 by Cameron Kessler, Evergreen Wastewater. Filed from a phone.
Report
- Date of service
- Feb 20, 2023
- Tank size
- 1000 gal
- Compartments
- 2
- Parts this system has
- Septic tank, Distribution box, Drainfield or mound
- Gallons pumped
- 1009 gal
- Sludge depth
- 8 in
- Scum depth
- 9 in
- Baffles in good condition
- Yes
- Effluent filter
- Replaced
- Lids and risers secure
- Yes
- Distribution box level, clear and undamaged
- Yes
- Drainfield or mound: no surfacing, soggy ground or odor
- Yes
- Disposal site
- Regional wastewater plant
- Repair needed
- No
- Photos
- 2 attached
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Cameron Kessler, current on the service date
- All required fields present
- Address matches parcel 041-59-01083
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.
Property
1854 Quarry Ct
Owner: Avery Nguyen
Parcel 041-59-01083