Back to the septic review queue

Septic maintenance (pump-out): 4195 Hickory Dr

Approved

Filed Sep 22, 2023 by Cameron Kessler, Evergreen Wastewater. Filed from a phone.

Report

Date of service
Sep 22, 2023
Tank size
1000 gal
Compartments
1
Parts this system has
Septic tank, Pump tank and effluent pump, High-water alarm, Drainfield or mound
Gallons pumped
1048 gal
Sludge depth
31 in
Scum depth
4 in
Baffles in good condition
No
Effluent filter
Cleaned
Lids and risers secure
Yes
Pump runs and the floats turn it on and off
No
Alarm tested and working
Yes
Drainfield or mound: no surfacing, soggy ground or odor
Yes
Disposal site
Regional wastewater plant
Repair needed
No
Photos
None
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Cameron Kessler, current on the service date
  • All required fields present
  • Address matches parcel 041-31-01042
  • Sludge is over a third of a typical tank depth; check for system failure.
  • Baffles reported damaged; county may require repair.
  • Pump or floats reported not working.
  • No photos attached.
  • Result: passing. Next due date resets when approved.

Decision

Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.

Property

4195 Hickory Dr
Owner: Riley Fairley
Parcel 041-31-01042