Back to the backflow review queue

Backflow assembly test: 4804 Quarry Way

Approved

Filed Aug 3, 2026 by Parker Ashby, Valley Backflow Testing. Filed from a phone.

Report

Date of service
Aug 3, 2026
Assembly type
DC
Serial number
B561085
Size
1
Test gauge serial
G-8048
Gauge calibration date
Jun 5, 2026
Check valve 1
4.1 psid
Check valve 1 closed tight
Yes
Check valve 2
2.7 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Parker Ashby, current on the service date
  • All required fields present
  • Address matches parcel 041-35-01186
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.

Property

4804 Quarry Way
Owner: Morgan Calloway
Parcel 041-35-01186