Back to the backflow review queue
Backflow assembly test: Corner Bakery
ApprovedFiled Feb 10, 2026 by Parker Ashby, Valley Backflow Testing. Read in from a paper form and confirmed by staff.
Report
- Date of service
- Feb 10, 2026
- Assembly type
- RP
- Serial number
- K383396
- Size
- 1
- Test gauge serial
- G-1883
- Gauge calibration date
- Aug 20, 2025
- Check valve 1
- 7.5 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 3.9 psid
- Relief valve opened at
- 4 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Parker Ashby, current on the service date
- All required fields present
- Address matches parcel 041-56-01339
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.
Property
7181 Orchard Way
Owner: Wexler Holdings LLC
Parcel 041-56-01339