Back to the backflow review queue

Backflow assembly test: Hilltop Grill

Approved

Filed Aug 9, 2026 by Parker Fairley, Patriot Plumbing & Backflow. Read in from a paper form and confirmed by staff.

Report

Date of service
Aug 9, 2026
Assembly type
RP
Serial number
W437197
Size
1 1/2
Test gauge serial
G-6102
Gauge calibration date
Nov 26, 2025
Check valve 1
6.6 psid
Check valve 1 closed tight
Yes
Check valve 2
3.5 psid
Relief valve opened at
2.5 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Parker Fairley, current on the service date
  • All required fields present
  • Address matches parcel 053-70-01070
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by J. Staff. The property's next due date is set and the owner gets a receipt.

Property

3679 Sycamore Rd
Owner: Kessler Holdings LLC
Parcel 053-70-01070