Back to the backflow review queue

Backflow assembly test: 9102 Pine Knoll Rd

Approved

Filed Jul 28, 2025 by Parker Fairley, Patriot Plumbing & Backflow. Filed from a phone.

Report

Date of service
Jul 28, 2025
Assembly type
PVB
Serial number
Z351646
Size
1
Test gauge serial
G-2725
Gauge calibration date
Mar 25, 2025
Check valve 1
5.8 psid
Check valve 1 closed tight
Yes
Check valve 2
3.6 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Parker Fairley, current on the service date
  • All required fields present
  • Address matches parcel 053-53-01180
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.

Property

9102 Pine Knoll Rd
Owner: Emerson Nguyen
Parcel 053-53-01180