Back to the backflow review queue
Backflow assembly test: 2980 Cedar Hollow Way
ApprovedFiled Oct 11, 2024 by Rowan Benton, Summit Plumbing & Backflow. Filed from a phone.
Report
- Date of service
- Oct 11, 2024
- Assembly type
- RP
- Serial number
- K190720
- Size
- 1
- Test gauge serial
- G-1468
- Gauge calibration date
- May 28, 2024
- Check valve 1
- 6.8 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 2.4 psid
- Relief valve opened at
- 3.9 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Rowan Benton, current on the service date
- All required fields present
- Address matches parcel 053-98-01195
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.
Property
2980 Cedar Hollow Way
Owner: Avery Harlow
Parcel 053-98-01195