Back to the backflow review queue

Backflow assembly test: 2980 Cedar Hollow Way

Approved

Filed Oct 9, 2025 by Cameron Kessler, Summit Plumbing & Backflow. Filed from a phone.

Report

Date of service
Oct 9, 2025
Assembly type
RP
Serial number
K190720
Size
1
Test gauge serial
G-9459
Gauge calibration date
Dec 5, 2024
Check valve 1
0.8 psid
Check valve 1 closed tight
No
Check valve 2
1.7 psid
Relief valve opened at
3.6 psid
Result
Fail
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Cameron Kessler, current on the service date
  • All required fields present
  • Address matches parcel 053-98-01195
  • Readings in range, no flags
  • Result: needs follow-up. The property stays on the overdue list until a passing report arrives.

Decision

Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.

Property

2980 Cedar Hollow Way
Owner: Avery Harlow
Parcel 053-98-01195