Back to the backflow review queue

Backflow assembly test: Golden Brewing Co

Approved

Filed Nov 10, 2024 by Parker Pruitt, Patriot Plumbing & Backflow. Filed from a phone.

Report

Date of service
Nov 10, 2024
Assembly type
RP
Serial number
Z410195
Size
4
Test gauge serial
G-1121
Gauge calibration date
May 29, 2024
Check valve 1
6.5 psid
Check valve 1 closed tight
Yes
Check valve 2
3.2 psid
Relief valve opened at
2.4 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Parker Pruitt, current on the service date
  • All required fields present
  • Address matches parcel 053-33-01140
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by J. Staff. The property's next due date is set and the owner gets a receipt.

Property

6421 Quarry Trl
Owner: Calloway Holdings LLC
Parcel 053-33-01140