Back to the backflow review queue

Backflow assembly test: 2583 Ridgeview Ln

Approved

Filed Aug 7, 2024 by Parker Fairley, Patriot Plumbing & Backflow. Filed from a phone.

Report

Date of service
Aug 7, 2024
Assembly type
PVB
Serial number
K676837
Size
1
Test gauge serial
G-2205
Gauge calibration date
Jun 13, 2024
Check valve 1
3.8 psid
Check valve 1 closed tight
Yes
Check valve 2
1.8 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Parker Fairley, current on the service date
  • All required fields present
  • Address matches parcel 053-13-01128
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by J. Staff. The property's next due date is set and the owner gets a receipt.

Property

2583 Ridgeview Ln
Owner: Cameron Lindqvist
Parcel 053-13-01128