Back to the backflow review queue
Backflow assembly test: 5260 Old Church Trl
ApprovedFiled May 10, 2025 by Parker Pruitt, Patriot Plumbing & Backflow. Filed from a phone.
Report
- Date of service
- May 10, 2025
- Assembly type
- RP
- Serial number
- A333000
- Size
- 1
- Test gauge serial
- G-5255
- Gauge calibration date
- Jan 24, 2024
- Check valve 1
- 0.8 psid
- Check valve 1 closed tight
- No
- Check valve 2
- 1.7 psid
- Relief valve opened at
- 3.3 psid
- Result
- Fail
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Parker Pruitt, current on the service date
- All required fields present
- Address matches parcel 053-92-01093
- Test gauge calibration is more than a year old.
- Result: needs follow-up. The property stays on the overdue list until a passing report arrives.
Decision
Approved by J. Staff. The property's next due date is set and the owner gets a receipt.
Property
5260 Old Church Trl
Owner: Logan Nguyen
Parcel 053-92-01093