Back to the backflow review queue
Backflow assembly test: 5798 Stone Gate Way
ApprovedFiled Dec 6, 2023 by Hayden Pruitt, Northstar Plumbing & Backflow. Filed from a phone.
Report
- Date of service
- Dec 6, 2023
- Assembly type
- PVB
- Serial number
- K647793
- Size
- 3/4
- Test gauge serial
- G-2010
- Gauge calibration date
- Aug 14, 2023
- Check valve 1
- 6.7 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 1.4 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Hayden Pruitt, current on the service date
- All required fields present
- Address matches parcel 055-64-01312
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.
Property
5798 Stone Gate Way
Owner: Quinn Vance
Parcel 055-64-01312