Back to the backflow review queue

Backflow assembly test: Maple Leaf Bakery

Approved

Filed Jun 18, 2025 by Emerson Calloway, Ridge Plumbing & Backflow. Filed from a phone.

Report

Date of service
Jun 18, 2025
Assembly type
RP
Serial number
A959684
Size
1
Test gauge serial
G-8480
Gauge calibration date
Mar 20, 2025
Check valve 1
5.1 psid
Check valve 1 closed tight
Yes
Check valve 2
2.8 psid
Relief valve opened at
2.8 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Emerson Calloway, current on the service date
  • All required fields present
  • Address matches parcel 055-24-01000
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by J. Staff. The property's next due date is set and the owner gets a receipt.

Property

5843 Pine Knoll Trl
Owner: Pruitt Holdings LLC
Parcel 055-24-01000