Back to the stormwater review queue
Stormwater facility inspection: Main Street Market
ApprovedFiled Dec 26, 2024 by Taylor Vance, Keystone Engineering. Filed from a phone.
Report
- Date of service
- Dec 26, 2024
- Facility type
- Underground detention
- Sediment accumulation
- 20 % of capacity
- Inlet and outlet clear
- Yes
- Erosion or embankment damage
- No
- Vegetation maintained
- Yes
- Functioning as designed
- Yes
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Taylor Vance, current on the service date
- All required fields present
- Address matches parcel 059-74-01309
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.
Property
3112 Laurel Way
Owner: Ramirez Holdings LLC
Parcel 059-74-01309