Back to the backflow review queue
Backflow assembly test: Main Street Brewing Co
ApprovedFiled Oct 5, 2026 by Avery Ramirez, Patriot Plumbing & Backflow. Filed from a phone.
Report
- Date of service
- Oct 5, 2026
- Assembly type
- DC
- Serial number
- W609157
- Size
- 2
- Test gauge serial
- G-1238
- Gauge calibration date
- Jul 9, 2026
- Check valve 1
- 3.9 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 2 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Avery Ramirez, current on the service date
- All required fields present
- Address matches parcel 059-92-01201
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.
Property
5495 Orchard Ln
Owner: Harlow Holdings LLC
Parcel 059-92-01201