Back to the backflow review queue
Backflow assembly test: 2099 Orchard Ln
ApprovedFiled Mar 27, 2025 by Taylor Ashby, Valley Backflow Testing. Read in from a paper form and confirmed by staff.
Report
- Date of service
- Mar 27, 2025
- Assembly type
- PVB
- Serial number
- B484679
- Size
- 1
- Test gauge serial
- G-3514
- Gauge calibration date
- Jun 17, 2024
- Check valve 1
- 5.4 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 2.8 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Taylor Ashby, current on the service date
- All required fields present
- Address matches parcel 061-13-01217
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.
Property
2099 Orchard Ln
Owner: Parker Hollins
Parcel 061-13-01217