Back to the backflow review queue

Backflow assembly test: Blue Heron Elementary School

Approved

Filed Oct 17, 2026 by Drew Hollins, Summit Backflow Testing. Read in from a paper form and confirmed by staff.

Report

Date of service
Oct 17, 2026
Assembly type
DC
Serial number
Z317913
Size
1 1/2
Test gauge serial
G-8854
Gauge calibration date
Jan 8, 2026
Check valve 1
6.6 psid
Check valve 1 closed tight
Yes
Check valve 2
1.4 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Drew Hollins, current on the service date
  • All required fields present
  • Address matches parcel 071-66-01295
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by J. Staff. The property's next due date is set and the owner gets a receipt.

Property

3220 Fox Run Rd
Owner: Benton Holdings LLC
Parcel 071-66-01295