Back to the stormwater review queue
Stormwater facility inspection: Crossroads Dental
ApprovedFiled Aug 28, 2024 by Drew Harlow, Evergreen Engineering. Filed from a phone.
Report
- Date of service
- Aug 28, 2024
- Facility type
- Manufactured treatment device
- Sediment accumulation
- 29 % of capacity
- Inlet and outlet clear
- Yes
- Erosion or embankment damage
- No
- Vegetation maintained
- Yes
- Functioning as designed
- Yes
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Drew Harlow, current on the service date
- All required fields present
- Address matches parcel 073-29-01258
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.
Property
6575 Turkey Hill Ct
Owner: Marsh Holdings LLC
Parcel 073-29-01258