Back to the stormwater review queue

Stormwater facility inspection: Crossroads Taqueria

Approved

Filed Dec 24, 2025 by Drew Harlow, Evergreen Engineering. Filed from a phone.

Report

Date of service
Dec 24, 2025
Facility type
Dry pond
Sediment accumulation
67 % of capacity
Inlet and outlet clear
No
Erosion or embankment damage
No
Vegetation maintained
No
Maintenance needed
Remove sediment at forebay; clear outlet trash rack
Functioning as designed
No
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Drew Harlow, current on the service date
  • All required fields present
  • Address matches parcel 073-70-01208
  • Sediment over 50% of capacity: cleanout needed.
  • Blocked inlet or outlet.
  • Result: needs follow-up. The property stays on the overdue list until a passing report arrives.

Decision

Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.

Property

3053 Mill Creek Way
Owner: Whitcomb Holdings LLC
Parcel 073-70-01208