Back to the backflow review queue

Backflow assembly test: 780 Pine Knoll Trl

Approved

Filed Jan 17, 2024 by Quinn Stroud, Patriot Plumbing & Backflow. Read in from a paper form and confirmed by staff.

Report

Date of service
Jan 17, 2024
Assembly type
RP
Serial number
K332010
Size
1
Test gauge serial
G-2954
Gauge calibration date
Jul 8, 2023
Check valve 1
5.2 psid
Check valve 1 closed tight
Yes
Check valve 2
2.6 psid
Relief valve opened at
3.4 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Quinn Stroud, current on the service date
  • All required fields present
  • Address matches parcel 075-97-01256
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.

Property

780 Pine Knoll Trl
Owner: Jordan Hollins
Parcel 075-97-01256