Back to the backflow review queue
Backflow assembly test: 780 Pine Knoll Trl
ApprovedFiled Jan 17, 2024 by Quinn Stroud, Patriot Plumbing & Backflow. Read in from a paper form and confirmed by staff.
Report
- Date of service
- Jan 17, 2024
- Assembly type
- RP
- Serial number
- K332010
- Size
- 1
- Test gauge serial
- G-2954
- Gauge calibration date
- Jul 8, 2023
- Check valve 1
- 5.2 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 2.6 psid
- Relief valve opened at
- 3.4 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Quinn Stroud, current on the service date
- All required fields present
- Address matches parcel 075-97-01256
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.
Property
780 Pine Knoll Trl
Owner: Jordan Hollins
Parcel 075-97-01256