Back to the backflow review queue

Backflow assembly test: 7106 Stone Gate Ln

Approved

Filed Nov 1, 2026 by Quinn Stroud, Patriot Plumbing & Backflow. Filed from a phone.

Report

Date of service
Nov 1, 2026
Assembly type
DC
Serial number
W335208
Size
1
Test gauge serial
G-2726
Gauge calibration date
Feb 28, 2026
Check valve 1
5.5 psid
Check valve 1 closed tight
Yes
Check valve 2
1.9 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Quinn Stroud, current on the service date
  • All required fields present
  • Address matches parcel 075-13-01160
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by J. Staff. The property's next due date is set and the owner gets a receipt.

Property

7106 Stone Gate Ln
Owner: Jamie Wexler
Parcel 075-13-01160